You are viewing the results of an advanced search. To change your search criteria or start a new search, click here.
BMP ID |
Short Title |
Text |
Source Publication |
---|
11840 |
Operator Will Respond to Noise Complaints |
"12. Noise. ... Operator shall respond to all reasonable complaints regarding noise." |
(Draft) Memorandum of Understanding Between Elbert County and Operator |
11839 |
Noise Complaint Contact Information |
"12. Noise. Operator shall provide and post 24-hour, 7 days per week contact information to deal with all noise complaints arising from Operator's ... |
(Draft) Memorandum of Understanding Between Elbert County and Operator |
11822 |
Operational Impacts at Wells With Setbacks Less Than 1000 Feet Must Be Mitigated |
"3. Setbacks. Any setbacks less than one-thousand feet (1000') from a building unit or outdoor venue or recreation area as defined by COGCC, shall be ... |
(Draft) Memorandum of Understanding Between Elbert County and Operator |
10085 |
Equipment Must Be Electric |
"19. Electric equipment. The Operator shall use electric-powered engines for motors, compressors, and drilling and production equipment and for ... |
A Resolution Approving an Oil and Gas Operator Agreement and Site Access Agreement {between Town of Timnath and] Peterson Energy, 2015 |
10391 |
Noise Mitigation Must Be in Compliance With COGCC Regulations |
"32. Noise Mitigation ... Following completion, Operator shall ensure that noise from the well shall comply with the sound limitation regulations set ... |
A Resolution Approving an Oil and Gas Operator Agreement and Site Access Agreement {between Town of Timnath and] Peterson Energy, 2015 |
10390 |
Temporary Perimeter Sound Wall Must Be Used During Drilling and Completion |
"32. Noise mitigation. During drilling and completion operations, noise mitigation shall be achieved using the Temporary Perimeter Sound Wall." |
A Resolution Approving an Oil and Gas Operator Agreement and Site Access Agreement {between Town of Timnath and] Peterson Energy, 2015 |
12083 |
The drilling rig(s) shall utilize electric line power |
"18. Electric Equipment. The drilling rig(s) used during the Drilling Phase and all permanent product ion equipment, such as compressors, motors and ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12191 |
Noise mitigation measures near residental developments |
"31. Noise Mitigation. Noise mitigation measures shall be constructed along any edge of any Well Site if such edge is in proximity to existing ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12201 |
Noise measurements taken by third party contractor |
"31. Noise Mitigation... All measurements considered for compliance with this Section 31 shall be taken by a third party contractor using industry ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12202 |
Ambient noise survey for each Well Site |
"31. Noise Mitigation... Both the City and the Operator have conducted an Ambient noise survey for each Well Site at baseline and will place noise ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12200 |
Noise levels for Construction Phase of operations |
"31. Noise Mitigation... During pad construction at the Well Sites, the Operator agrees that noise levels shall not exceed those produced by the ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12197 |
Use of a perimeter wall and/or hay bales to mitigate noise |
"31. Noise Mitigation... During the Drilling and Completion Phases, the operator shall construct a perimeter wall and/or use hay bales to mitigate ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12198 |
Non-electrical engines shall use quiet design mufflers |
"31. Noise Mitigation... If Operator uses any engines that are not electrically operated, Operator shall use quiet design mufflers (also referred to ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12193 |
Compliance with the sound limitation regulations |
"31. Noise Mitigation... Operator shall comply with the sound limitation regulations set forth in COGCC 800 Series Aesthetic and Noise Control ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12192 |
Use of the most current equipment to minimize noise |
"31. Noise Mitigation... The noise mitigation measures shall use the most current equipment to minimize noise impact during the Drilling and ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12196 |
Noise/vibration mitigation through berming |
"31. Noise Mitigation... The Operator shall address C scale noise/vibration through berming and other associated BMPs." |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12199 |
COGCC Rule 802 on noise abatement |
"31. Noise Mitigation... The Operator shall comply with all provisions of COGCC Rule 802 on Noise Abatement with respect to the Well Sites; provided, ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12194 |
Unloading of pipes on Well Site |
"31. Noise Mitigation... The Operator shall not unload pipe between 8:00 p.m. and 7:00 a.m." |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
12195 |
Completion of a baseline noise mitigation study |
"31. Noise Mitigation... The Operator will complete a baselinenoise mitigation study at each Well Site that demonstrates that noise is expected to be ... |
Amended and Restated Oil and Gas Operator Agreement, City and County of Broomfield and Extraction, 2017; Exhibit B. Best Management Practices for Well Sites and New Wells at Well Sites |
9816 |
Use electric-powered engines |
"12. Electric equipment. The Operator shall take all reasonable efforts to use electric-powered engines for motors, compressors, and drilling and ... |
Brighton Memorandum of Understanding, (Draft Model) |
9774 |
Noise mitigation plan |
"4. Noise. Operator shall provide a noise mitigation plan to the City and will list conditions from the noise mitigation plan as conditions for COGCC ... |
Brighton Memorandum of Understanding, (Draft Model) |
8868 |
Electric Equipment |
"19. Electric Equipment. The Operator shall take all reasonable efforts touse electric-powered engines for motors, compressors, and drilling ... |
City and County of Broomfield Oil and Gas Operator Agreement, Sovereign, Extraction, Final, 2013 |
9033 |
Noise Mitigation Study |
"32. Noise mitigation. . . A noise mitigation study shall be submitted with the application to demonstrate that noise will be decreased to the ... |
City and County of Broomfield Oil and Gas Operator Agreement, Sovereign, Extraction, Final, 2013 |
9032 |
Noise Mitigation Around Residential Development |
"32. Noise mitigation. Noise mitigation measures shall be constructed along any edge of any oil and gas operation site if such edge is adjacent to ... |
City and County of Broomfield Oil and Gas Operator Agreement, Sovereign, Extraction, Final, 2013 |
8797 |
Compressor equipment must have acoustically insulating material/housing and meet COGCC noise standards |
"1. Oil and Gas Operations Sites. e. … Any compressor equipment...shall be surrounded by acoustically insulating material or housing and meet COGCC ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
8783 |
Compression equipment must be approved by City |
"13. Use of Sites. ...Any compression equipment proposed for any Site shall be approved by the City..." |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9358 |
Equipment must not exceed maximum noise level under state law or COGCC |
"17. Noise Regulation and Special Mitigation Measures. a. At a minimum, any equipment used in the drilling, completion or production of a well must ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9361 |
City will consider weather patterns when determining necessity of additional mitigation measures |
"17. Noise Regulation and Special Mitigation Measures. b. ....a. In determining such additional noise mitigation, specific site characteristics shall ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9362 |
City will consider vegitative cover when determining if additional noise mitigation necessary |
"17. Noise Regulation and Special Mitigation Measures. b. ....In determining such additional noise mitigation, specific site characteristics shall be ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9360 |
City will consider adjacent development when determining if additional noise mitigation necessary |
"17. Noise Regulation and Special Mitigation Measures. b. ....In determining such additional noise mitigation, specific site characteristics shall be ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9359 |
Company to provide additional noise mitigation if necessary |
"17. Noise Regulation and Special Mitigation Measures. b. The Company shall provide additional noise mitigation that may be reasonably required by ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9366 |
Noise mitigation may require screening by fence or landscaping |
"17. Noise Regulation and Special Mitigation Measures. c. ...(ii). Screening of the site or noise-emitting equipment by fence or landscaping;" |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9367 |
Noise mitigation may require wall/fence or acoustically insulating material around all or part of facility |
"17. Noise Regulation and Special Mitigation Measures. c. ...(iii). Solid wall or fence of acoustically insulating material surrounding all or part ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9368 |
Noise mitigation may require electric powered sytstems |
"17. Noise Regulation and Special Mitigation Measures. c. ...(iv). Use of electric-power engines and motors, and pumping systems; and/or..." |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9369 |
Construction must comply with applicable building and fire codes |
"17. Noise Regulation and Special Mitigation Measures. c. ...(v). Construction of any buildings or other enclosures shall comply with applicable ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9365 |
Noise mitigation may require acoustically insulated housing or covers |
"17. Noise Regulation and Special Mitigation Measures. c. ...One of more of the following additional noise abatement measures shall be provided by ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9364 |
Noise mitigation requirements may increase with proximity to residence and level of noise |
"17. Noise Regulation and Special Mitigation Measures. c. ...The level of required mitigation may increase with the proximity of the facility to ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
9363 |
City may require more noise mitigation measures than COGCC |
"17. Noise Regulation and Special Mitigation Measures.Further, based upon the specific site characteristics, the nature of the proposed activity, and ... |
Master Contract Concerning Consolidated Oil and Gas Exploration and Production Facilities, Property, Purchase, Oil and Gas Mineral Leases and Reciprocal Compensation between Longmont and TOP Operating, 2012 |
11884 |
Noise Mitigation |
"9. Noise. ... Noise mitigation measures shall be constructed along any edge of any oil and gas operation site if such edge is adjacent to the oil ... |
Memorandum of Understanding between Adams County and Oil and Gas Operators (Draft), ~2014 |
11883 |
Noise Complaint Contact Information |
"9. Noise. Operator shall abide by COGCC noise standards for all activities and provide and post 24-hour, 7 days per week contact information to deal ... |
Memorandum of Understanding between Adams County and Oil and Gas Operators (Draft), ~2014 |
8987 |
Noise Mitigation |
"9. Noise. ... Noise mitigation measures shall be constructed along any edge of any oil and gas operation site if such edge is adjacent to existing ... |
Memorandum of Understanding between Adams County and Oil and Gas Operators, 2015 |
8986 |
Noise Complaint Contact Information |
"9. Noise. Operator shall abide by COGCC noise standards for all activities and provide and post 24-hour, 7 days per week contact information to deal ... |
Memorandum of Understanding between Adams County and Oil and Gas Operators, 2015 |
11856 |
Noise Complaint Contact Information to be Displayed at Entrance to Access Road |
"7. Noise. ... Operator will post this information [24 hour, 7 days a week contact information to respond to all noise complaints] on a sign at the ... |
Memorandum of Understanding between Arapahoe County and Oil and Gas Operators, 2013 |
9291 |
Noise Complaint Contact Information |
"9. Noise. Operator shall provide and post 24-hour, 7 days per week contact information to deal with all noise complaints arising from Operator's oil ... |
Memorandum of Understanding between Arapahoe County and Oil and Gas Operators, 2013 |
11952 |
Noise mitigation plan |
"11. Noise Mitigation Measures. Operator shall prepare and implement a noise mitigation plan." |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11956 |
Time limits of impulsive and shrill noises |
"11. Noise Mitigation Measures. ... As set forth in COGCC Regulation 802.b, the noise levels shall be subject to increase for a period not to exceed ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11957 |
dB(C) noise regulation |
"11. Noise Mitigation Measures. ... For db(C) scale noise, Operator shall comply with the requirements of COGCC Regulation 802 as amended from time ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11964 |
Update noise mitigation plan upon relevant COGCC regulatory change |
"11. Noise Mitigation Measures. ... If COGCC enacts a new rule covering noise mitigation measures, then the City and Operator shall negotiate in good ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11958 |
Noise mitigation plan considerations |
"11. Noise Mitigation Measures. ... In determining noise mitigation proposed in the mitigation plan, specific site characteristics shall be ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11961 |
Noise mitigation plan to explore insulated enclosure of power systems |
"11. Noise Mitigation Measures. ... The following noise mitigations shall be considered in the noise mitigation plan: ... g. Acoustically insulated ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11963 |
Noise mitigation plan to explore abatement in high-density areas |
"11. Noise Mitigation Measures. ... The following noise mitigations shall be considered in the noise mitigation plan: ... i. Any abatement measures ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11960 |
Noise mitigation plan to identify hours and characteristics of emitted noise |
"11. Noise Mitigation Measures. ... The following noise mitigations shall be considered in the noise mitigation plan: f. Noise management plan ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11955 |
Plan to reduce industrial zone noise |
"11. Noise Mitigation Measures. ... The noise mitigation plan shall detail the reasonably practicable efforts ... to reduce the noise level for ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11954 |
Plan to reduce light industrial noise |
"11. Noise Mitigation Measures. ... The noise mitigation plan shall detail the reasonably practicable efforts to be used to reduce db(A) scale noise ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11959 |
Noise mitigation study for all well sites near community |
"11. Noise Mitigation Measures. ... Where the Well and Well Site are within an Urban Mitigation Area, or within 1,000 feet of a Useable Open Space, ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11962 |
Noise mitigation plan to explore electric equipment |
"11. Noise Mitigation Measures. [12. Electric Equipment.] ... The following noise mitigations shall be considered in the noise mitigation plan: ... ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11983 |
Noise mitigation plan compliance |
"4. Noise. ... Operator shall comply with applicable provisions of its noise mitigation plan." |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11982 |
Noise terms and conditions included in COGCC permits |
"4. Noise. ... Operator will include the terms of Section 3.5 of the Development Application and Section 11 of the MOU as conditions for COGCC ... |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
11981 |
Select operation local to minimize noise in surrounding community |
"4. Noise. The location of wellhead and production facilities has been selected to minimize any noise impacts to surrounding residents." |
Memorandum of Understanding between City of Brighton and Petro Operating Company, 2017 |
9158 |
Noise Complaint Contact Information |
"11. Noise. Operator shall provide and post 24-hour, 7 days per week contact information to deal with all noise complaints arising from Operator's ... |
Memorandum of Understanding Between Elbert County and Agave Oil and Gas LLC, 2014 |
9392 |
Noise, light, and dust mitigation plan |
"3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the Oil and Gas ... |
Memorandum of Understanding between Town of Erie and Anadarko/Kerr-McGee Oil and Gas Onshore LP, 2012 |
9084 |
Noise, light, and dust mitigation plan |
"3. Prior to commencement of any new drilling or completion operations, provide to an Erie designated staff member the following for the wellsite for ... |
Memorandum of Understanding between Town of Erie and Encana Oil and Gas, 2012 |
9250 |
Electric Equipment |
"19. Electric equipment. Electric-powered engines for motors, compressors, and drilling equipment and for pumping systems shall be used in order to ... |
Oil and Gas Operator Agreement Between the City of Fort Collins and Prospect Energy, LLC, 2013 |
9435 |
Noise Mitigation Study |
"33. Noise mitigation. . . A noise mitigation study shall be submitted with the application to demonstrate that noise will be decreased to the ... |
Oil and Gas Operator Agreement Between the City of Fort Collins and Prospect Energy, LLC, 2013 |
9434 |
Noise Mitigation Measures |
"33. Noise mitigation. Noise mitigation measures shall be constructed along any edge of any oil and gas operation site if such edge is between the ... |
Oil and Gas Operator Agreement Between the City of Fort Collins and Prospect Energy, LLC, 2013 |
9514 |
Noise reduced below maximum COGCC regulation level |
"2. Noise mitigation. Encana will comply with the following noise mitigation requirements at all pad sites:(a) For db(A) scale noise, Encana will ... |
Operator Agreement Between Erie and Encana Oil and Gas, 2015 |
9513 |
Noise mitigation |
"2. Noise mitigation. Encana will comply with the following noise mitigation requirements at all pad sites:(a) For db(A) scale noise, Encana will ... |
Operator Agreement Between Erie and Encana Oil and Gas, 2015 |
9517 |
Noise level reductions |
"2. Noise mitigation . . . (a). . . As set forth in COGCC Regulation 802.b, the noise levels shall be subject to . . . reduction for periodic, ... |
Operator Agreement Between Erie and Encana Oil and Gas, 2015 |
9516 |
Noise level increases |
"2. Noise mitigation . . . (a). . . As set forth in COGCC Regulation 802.b, the noise levels shall be subject to increase for a period not to exceed ... |
Operator Agreement Between Erie and Encana Oil and Gas, 2015 |
9515 |
Noise level measurement |
"2. Noise mitigation . . . (a). . . the noise level shall be measured as set forth in COGCC Regulations 802.b & c, except no measurements shall be ... |
Operator Agreement Between Erie and Encana Oil and Gas, 2015 |
9518 |
Compliance with COGCC Noise Regulation 802 |
"2. Noise mitigation . . . (b) For db(C) scale noise, Encana shall comply with the requirements of COGCC Regulation 802. as such requirements may be ... |
Operator Agreement Between Erie and Encana Oil and Gas, 2015 |