BMP ID Short Title Text of BMP
6154 Adopt a zero-tolerance drug usage policy Subcontractor Conduct: "Genesis has a zero-tolerance policy regarding drug usage. All subcontractors prior to working in the watersheds will have to ...
4859 Advance ID and flag all existing ROWs that would be crossed by proposed pipelines and roads Land Status/Use/Prior Rights: "Mitigation to prior rights would include the following: 108. advance identification and flagging of all existing ...
659 Advance identification and flagging of all existing ROWs that would be crossed by proposed pipelines and roads. "Mitigation to prior rights would include the following: advance identification and flagging of all existing ROWs [right of way] that would be ...
5625 Allow for freeboard between bottom of bridge girders and expected high water level/floating debris. "Bridges: Allow for some freeboard, typically at least 0.5 to 1.0 meter, between the bottom of bridge girders and expected high water level and ...
1578 Assist local governments with planning Socioeconomic: " As part of the annual planning process, Operators will provide multi-year field development forecasts to the BLM. These forecasts ...
2834 Avoid construction in highly scenic areas. "Natural Gas Operations: 1. Location: b. Where practical, avoid construction in highly scenic areas."
994 Avoid locating facilities near “prominent” features "Natural Gas Operations: 1. Location: e. Avoid locating facilities near “prominent” features."
4860 Backhoe and hand excavate at pipeline crossings until exact locations of existing underground lines are determined Land Status/Use/Prior Rights: "Mitigation to prior rights would include the following: 109. backhoe and hand excavating at pipeline crossings until ...
660 Backhoe and hand excavate at pipeline crossings until exact locations of underground lines have been determined. "Mitigation to prior rights would include the following: backhoe and hand excavating at pipeline crossings until the exact locations of existing ...
4864 Build adequate turnouts on new crowned-and-ditched roads Land Status/Use/Prior Rights: "Mitigation to prior rights would include the following: 113. Adequate turnouts on new crowned-and-ditched roads ...
664 Build adequate turnouts on new crowned-and-ditched roads. "Mitigation to prior rights would include the following: Adequate turnouts on new crowned-and-ditched roads would be built to provide access to ...
5419 Build footpaths along roadsides when necessary. "General Design: In community and urban areas, build footpaths along the road for the safety of people walking along the road. Use roadway surfacing ...
2529 Cedar Mountain SRMA: Protection of recreational and educational opportunities" "No Surface Occupancy: 12. Cedar Mountain SRMA: Protection of recreational and educational opportunities, and scenic values."
2839 Choose the best location for the road and its anticipated uses. "Natural Gas Operations: 1. Location: i. Do not reuse existing roads just because they are preexisting and you are hesitant to disturb new areas. ...
5966 Close out mud pits Land filling: "Mud pits, where used, should be closed out according to local regulatory requirements."
6030 Commerce should be defined prior to commencement of operations Local commerce with communities: "All commerce should be defined prior to commencement of operations, ensuring that endangered or rare flora and ...
1577 Communicate with landowners Socioeconomic: "Establish effective and frequent communication with affected ranchers to monitor and correct problems and coordinate scheduling."
7773 Community Relations: Create a community relations program to help reduce industry impacts to local communities 2007 Outstanding Oil and Gas Operations Award to Williams Production RMT, Encana, Laramie II, Noble Energy, and PetroHunter for creating a community ...
2470 Comprehensive Drilling Plan includes past economic uses of the land within previous 10 years. "c. Information requirements.... The following information may be included as part of a Comprehensive Drilling Plan, depending on the circumstances: ...
6019 Conduct voluntary resettlement activities New settlements: "In protected areas or sensitive habitats that have experienced new settlements, conduct voluntary resettlement activities, modeling ...