| BMP ID |
Short Title |
Text of BMP |
|---|
| 7934 |
Above ground facilities will be painted according to latest color charts |
"All above ground facilities including power boxes, building doors, roofs, and any visible equipment will bepainted the darker colors selected from ... |
| 8127 |
Alignment of facilities with respect to observation points |
"Visual Resources: Within Canyon Bottoms in VRM Class II areas, the alignment of facilities with respect to key observation points (roads in ... |
| 5187 |
All above-ground structures not subject to safety requirements shall be painted to blend with the landscape |
"Visual Resource Management: 15) All above-ground structures, production equipment, tanks, transformers, insulators, not subject to safety ... |
| 6517 |
All aboveground facilities to be painted a color that best allows them to blend into background. |
"All aboveground facilities including power boxes, building doors, roofs, and any visible equipment will be painted a color selected from the latest ... |
| 4554 |
All disturbance would need to meet the Class II VRM objectives. |
Visual Resource Management (VRM) - VRM Class II: "1. All disturbance would need to meet the Class II VRM objectives. The objective for Class II is to ... |
| 7929 |
All facility structures will be painted a color that blends with nature |
"All long-term facility structures, including worker housing, will be painted a color that enables the facilities to blendin with the natural ... |
| 7829 |
All flagging, and other debris will be gathered daily and disposed of |
Waste: "All pin flags, flagging, and other debris will be gathered daily and disposed of at an approved site or landfill." |
| 5147 |
All long-term facilities should be painted the same color. |
Partial Conformance: "All long-term facilities in a particular location should be painted the same color. An operator is typically provided 60 to 90 ... |
| 6526 |
Appendix A: Use of partial or completely below-grade wellheads encouraged in high visibility areas |
"The use of partial or completely below-grade wellheads will be strongly encouraged in high visibility areas as well as VRM Class I, II or III areas." |
| 5174 |
Areas to be drill seeded must have a smoother texture. |
Site Preparation: "Areas to be drill seeded must have a somewhat smoother texture." |
| 7095 |
Areas within .25 mile of East Fork Virgin River segments 36-37 open to oil and gas leasing with major constraints |
"Wild and Scenic Rivers: Suitable wild and scenic river 'recreational' segment East Fork Virgin River (segment 36-37) – OUTSIDE THE WSA: Manage oil ... |
| 7094 |
Areas within .25 mile of East Fork Virgin River segments 37-40a open to oil and gas leasing with major constraints |
"Wild and Scenic Rivers: Suitable 'scenic' river corridors: Manage oil and gas leasing as open subject to major constraints (NSO) in the East Fork ... |
| 2834 |
Avoid construction in highly scenic areas. |
"Natural Gas Operations: 1. Location: b. Where practical, avoid construction in highly scenic areas." |
| 4937 |
Avoid facility placement on steep slopes, ridge tops, and hill tops |
"Fluid Minerals: 14) Avoid facility placement on steep slopes, ridge tops, and hill tops" [Reduce impacts from fluid mineral construction, operation, ... |
| 7159 |
Avoid locating equipment near prominent features |
"Viewshed – form, line, color, and texture: Site selection: Avoid locating equipment near prominent features [scenic overlooks, etc.]." |
| 994 |
Avoid locating facilities near “prominent” features |
"Natural Gas Operations: 1. Location: e. Avoid locating facilities near “prominent” features." |
| 4985 |
Avoid locating facilities near prominent features. |
Avoid locating facilities near “prominent” features: " A prominent feature may be something with a specific name or that serves as a landmark." |
| 4947 |
Avoid locating facilities on or near ridgelines |
"Visual Resource Management: 3) Avoid locating facilities on or near ridgelines - use subsurface or low-profile facilities to prevent protrusion ... |
| 4946 |
Avoid locating pads in areas visible from primary roads |
"Visual Resource Management: 2) Avoid locating pads in areas visible from primary roads" |
| 4995 |
Avoid locating roads and pipelines on steep slopes. |
Avoid locating roads and pipelines on steep slopes: "Follow the contours of the land to reduce earthwork/disturbance." |