| BMP ID |
Short Title |
Text of BMP |
| 2801 |
401 certification required for disposal |
"The operator must obtain 401 Certification from the MDEQ if the disposal action need BLM approval." |
| 2809 |
401 certification required for disposal |
"Alternative E-Preferred Alternative: The operator must obtain 401 Certification from the MDEQ if the disposal action need BLM approval." |
| 5996 |
A designated third party contractor will prepare and conduct a water quality/monitoring program in the watersheds during energy exploration |
Exploration, Development, and Post-Development Watershed Monitoring: "A designated third party contractor, partially funded by Genesis, and in ... |
| 6066 |
A sampling and analysis plan (SAP) will be prepared and modeled after the hydrologic baseline study. |
WATERSHED PLAN: "A sampling and analysis plan (SAP) will be prepared and modeled after the hydrologic baseline study. The SAP will contain discussion ... |
| 6328 |
Access roads should be kept out of lowland bottoms... |
Access Roads: "Access roads should be kept out of lowland bottoms, drainages, wet areas and special status and threatened and endangered species ... |
| 6135 |
Achieve isolation of fresh water zones prior to deepening of the well |
Well Construction - Cementing/Surface Casing: "If the aforemenioned steps have not been achieved, remedial cement work will be conducted until ... |
| 6079 |
Add monitoring stations to accommodate specific areas of concern |
Watershed Plan: "Add surface water monitoring stations or groundwater monitoring wells to accommodate specific areas or issues of concern" |
| 6061 |
Add surface water monitoring stations |
WATERSHED PLAN: "Add surface water monitoring stations or groundwater monitoring wells to accommodate specific areas or issues of concern." |
| 1310 |
Address local scour of crossing for pipeline safety |
"In addition to long-term channel degradation at the pipeline crossing, local scour of the crossing must be addressed for pipeline safety." |
| 2570 |
Address other practices that will be used to reclaim and stabilize disturbed areas in reclamation plans |
Coalbed Methane: Reclamation: "Phased reclamation plans will be submitted to BLM for approval prior to individualPOD facility abandonment via a ... |
| 4717 |
Adhere to guidelines specified in SPCCPs |
Water Resources: "Operators would adhere to guidelines specified in SPCCPs." |
| 1611 |
All blow-out equipment and elastomers should be suitable for oil-based mud. |
Project Citing and Operation: "All blow-out preventer equipment and all elastomers in the mud system will be suitable for oil based mud." |
| 4938 |
All facilities that potentially leak or spill should be placed within containment or diversionary structures |
"Fluid Minerals: 15) All production facilities installed on location that have the potential to leak or spill oil, glycol, produced water, or other ... |
| 2268 |
All oil and gas locations are subject to the BMP Practices requirements of Rule 1002.f.(2) |
"f. Stormwater management. (1) All oil and gas locations are subject to the Best Management Practices requirements of Rule 1002.f.(2). In addition, ... |
| 639 |
All pits containing fluids would be fenced to exclude livestock. |
Livestock/Grazing: "All pits containing fluids would be fenced to exclude livestock." |
| 1815 |
All production facilities with the potential to leak will be placed within appropriate containment |
Production Facilities: "Treaters, dehydrators and other production facilities installed on location, that have the potential to leak or spill oil, ... |
| 1189 |
All roads must follow Gold Book standards |
"Soils and Water- Mitigation Measures: Various techniques will be employed to reduce soil erosion. ... Depending upon the site-specific situation, ... |
| 3043 |
All water used for beneficial use will be under jurisdiction of the Wyoming State Engineer's Office |
A.12 Groundwater and Surface Water: "All water wells put to beneficial use, including produced water associated with this project, will be under the ... |
| 3042 |
All water used myst be permitted by the Wyoming State Engineer's Office |
A.12 Groundwater and Surface Water: "All water used in association with this project will be permitted through the Wyoming State Engineer's Office." |
| 2887 |
Allow department access to facilities and documents |
"Monitoring, Recording, and Reporting Requirements: Inspection and Entry: The permittee shall allow the head of the Department or the Regional ... |