| BMP ID |
Short Title |
Text of BMP |
|---|
| 474 |
50 percent of the pit should be below original ground level |
Well Sites: Reserve Pits: "If [locating the pit on the drill pad next to the high wall] is not possible, at least 50 percent of the reserve pit ... |
| 507 |
Accommodate a 10-year flood with culverts |
Drainage and Drainage Structures: Surface Drainage: "Culverts should accommodate a 10-year flood without development of a static head and avoid ... |
| 6135 |
Achieve isolation of fresh water zones prior to deepening of the well |
Well Construction - Cementing/Surface Casing: "If the aforemenioned steps have not been achieved, remedial cement work will be conducted until ... |
| 6061 |
Add monitoring stations to accommodate specific areas of concern |
Watershed Plan: "Add surface water monitoring stations or groundwater monitoring wells to accommodate specific areas or issues of concern." |
| 6079 |
Add monitoring stations to accommodate specific areas of concern |
Watershed Plan: "Add surface water monitoring stations or groundwater monitoring wells to accommodate specific areas or issues of concern" |
| 1310 |
Address local scour of crossing for pipeline safety |
"In addition to long-term channel degradation at the pipeline crossing, local scour of the crossing must be addressed for pipeline safety." |
| 2570 |
Address practices that reclaim and stabilize disturbed areas in reclamation plans |
Coalbed Methane: Reclamation: "Phased reclamation plans will be submitted to BLM for approval prior to individualPOD facility abandonment via a ... |
| 4717 |
Adhere to guidelines specified in SPCCPs |
Water Resources: "Operators would adhere to guidelines specified in SPCCPs." |
| 7999 |
All cutting piles will be on an impermeable barrier |
"Water Resources: All cuttings piles would be located on an impermeable barrier and provided with secondary containment orother BMPs to prevent ... |
| 4938 |
All facilities that potentially leak or spill should be placed within containment or diversionary structures |
"Fluid Minerals: 15) All production facilities installed on location that have the potential to leak or spill oil, glycol, produced water, or other ... |
| 2268 |
All oil and gas locations are subject to the BMP Practices requirements of Rule 1002.f.(2) |
"f. Stormwater management. (1) All oil and gas locations are subject to the Best Management Practices requirements of Rule 1002.f.(2). In addition, ... |
| 639 |
All pits containing fluids should be fenced to exclude livestock. |
Livestock/Grazing: "All pits containing fluids would be fenced to exclude livestock." |
| 1815 |
All production facilities with the potential to leak will be placed within appropriate containment |
Production Facilities: "Treaters, dehydrators and other production facilities installed on location, that have the potential to leak or spill oil, ... |
| 5734 |
All proposed actions on public lands will be analyzed for their potential to release hazardous materials into the environment. |
HAZARDOUS MATERIALS AND WASTES: "HZ04 – All proposed actions on public lands will be analyzed for their potential to release hazardous materials ... |
| 1189 |
All roads must follow Gold Book standards |
"Soils and Water- Mitigation Measures: Various techniques will be employed to reduce soil erosion. ... Depending upon the site-specific situation, ... |
| 3043 |
All water used for beneficial use will be under jurisdiction of the Wyoming State Engineer's Office |
A.12 Groundwater and Surface Water: "All water wells put to beneficial use, including produced water associated with this project, will be under the ... |
| 3042 |
All water used myst be permitted by the Wyoming State Engineer's Office |
A.12 Groundwater and Surface Water: "All water used in association with this project will be permitted through the Wyoming State Engineer's Office." |
| 2887 |
Allow department access to facilities and documents |
"Monitoring, Recording, and Reporting Requirements: Inspection and Entry: The permittee shall allow the head of the Department or the Regional ... |
| 116 |
Allow new surface-disturbing activities on critical soils |
Soil and Water Resources: "SW01/PW30 – Allow new surface-disturbing activities on critical soils on about 75,000 acres within level 3 lands only if ... |
| 3017 |
Allowances for temporary and minor disturbances |
A.6 Pipelines: "Temporary disturbances which do not require major excavation (e.g., small pipelines and communication lines) may be stripped of ... |