BMP of Oil and Gas Development

Browse BMPs

Text search: Category: Location:
Advanced Search...
BMP ID Short Title Text of BMP
2801 401 certification required for disposal "The operator must obtain 401 Certification from the MDEQ if the disposal action need BLM approval."
2809 401 certification required for disposal "Alternative E-Preferred Alternative: The operator must obtain 401 Certification from the MDEQ if the disposal action need BLM approval."
5996 A designated third party contractor will prepare and conduct a water quality/monitoring program in the watersheds during energy exploration Exploration, Development, and Post-Development Watershed Monitoring: "A designated third party contractor, partially funded by Genesis, and in ...
6066 A sampling and analysis plan (SAP) will be prepared and modeled after the hydrologic baseline study. WATERSHED PLAN: "A sampling and analysis plan (SAP) will be prepared and modeled after the hydrologic baseline study. The SAP will contain discussion ...
6328 Access roads should be kept out of lowland bottoms... Access Roads: "Access roads should be kept out of lowland bottoms, drainages, wet areas and special status and threatened and endangered species ...
6135 Achieve isolation of fresh water zones prior to deepening of the well Well Construction - Cementing/Surface Casing: "If the aforemenioned steps have not been achieved, remedial cement work will be conducted until ...
6079 Add monitoring stations to accommodate specific areas of concern Watershed Plan: "Add surface water monitoring stations or groundwater monitoring wells to accommodate specific areas or issues of concern"
6061 Add surface water monitoring stations WATERSHED PLAN: "Add surface water monitoring stations or groundwater monitoring wells to accommodate specific areas or issues of concern."
1310 Address local scour of crossing for pipeline safety "In addition to long-term channel degradation at the pipeline crossing, local scour of the crossing must be addressed for pipeline safety."
2570 Address other practices that will be used to reclaim and stabilize disturbed areas in reclamation plans Coalbed Methane: Reclamation: "Phased reclamation plans will be submitted to BLM for approval prior to individualPOD facility abandonment via a ...
4717 Adhere to guidelines specified in SPCCPs Water Resources: "Operators would adhere to guidelines specified in SPCCPs."
1611 All blow-out equipment and elastomers should be suitable for oil-based mud. Project Citing and Operation: "All blow-out preventer equipment and all elastomers in the mud system will be suitable for oil based mud."
4938 All facilities that potentially leak or spill should be placed within containment or diversionary structures "Fluid Minerals: 15) All production facilities installed on location that have the potential to leak or spill oil, glycol, produced water, or other ...
2268 All oil and gas locations are subject to the BMP Practices requirements of Rule 1002.f.(2) "f. Stormwater management. (1) All oil and gas locations are subject to the Best Management Practices requirements of Rule 1002.f.(2). In addition, ...
639 All pits containing fluids would be fenced to exclude livestock. Livestock/Grazing: "All pits containing fluids would be fenced to exclude livestock."
1815 All production facilities with the potential to leak will be placed within appropriate containment Production Facilities: "Treaters, dehydrators and other production facilities installed on location, that have the potential to leak or spill oil, ...
1189 All roads must follow Gold Book standards "Soils and Water- Mitigation Measures: Various techniques will be employed to reduce soil erosion. ... Depending upon the site-specific situation, ...
3043 All water used for beneficial use will be under jurisdiction of the Wyoming State Engineer's Office A.12 Groundwater and Surface Water: "All water wells put to beneficial use, including produced water associated with this project, will be under the ...
3042 All water used myst be permitted by the Wyoming State Engineer's Office A.12 Groundwater and Surface Water: "All water used in association with this project will be permitted through the Wyoming State Engineer's Office."
2887 Allow department access to facilities and documents "Monitoring, Recording, and Reporting Requirements: Inspection and Entry: The permittee shall allow the head of the Department or the Regional ...