BMP ID Short Title Text of BMP
474 50 percent of the pit should be below original ground level Well Sites: Reserve Pits: "If [locating the pit on the drill pad next to the high wall] is not possible, at least 50 percent of the reserve pit ...
507 Accommodate a 10-year flood with culverts Drainage and Drainage Structures: Surface Drainage: "Culverts should accommodate a 10-year flood without development of a static head and avoid ...
6135 Achieve isolation of fresh water zones prior to deepening of the well Well Construction - Cementing/Surface Casing: "If the aforemenioned steps have not been achieved, remedial cement work will be conducted until ...
6061 Add monitoring stations to accommodate specific areas of concern Watershed Plan: "Add surface water monitoring stations or groundwater monitoring wells to accommodate specific areas or issues of concern."
6079 Add monitoring stations to accommodate specific areas of concern Watershed Plan: "Add surface water monitoring stations or groundwater monitoring wells to accommodate specific areas or issues of concern"
1310 Address local scour of crossing for pipeline safety "In addition to long-term channel degradation at the pipeline crossing, local scour of the crossing must be addressed for pipeline safety."
2570 Address practices that reclaim and stabilize disturbed areas in reclamation plans Coalbed Methane: Reclamation: "Phased reclamation plans will be submitted to BLM for approval prior to individualPOD facility abandonment via a ...
4717 Adhere to guidelines specified in SPCCPs Water Resources: "Operators would adhere to guidelines specified in SPCCPs."
7999 All cutting piles will be on an impermeable barrier "Water Resources: All cuttings piles would be located on an impermeable barrier and provided with secondary containment orother BMPs to prevent ...
4938 All facilities that potentially leak or spill should be placed within containment or diversionary structures "Fluid Minerals: 15) All production facilities installed on location that have the potential to leak or spill oil, glycol, produced water, or other ...
2268 All oil and gas locations are subject to the BMP Practices requirements of Rule 1002.f.(2) "f. Stormwater management. (1) All oil and gas locations are subject to the Best Management Practices requirements of Rule 1002.f.(2). In addition, ...
639 All pits containing fluids should be fenced to exclude livestock. Livestock/Grazing: "All pits containing fluids would be fenced to exclude livestock."
1815 All production facilities with the potential to leak will be placed within appropriate containment Production Facilities: "Treaters, dehydrators and other production facilities installed on location, that have the potential to leak or spill oil, ...
5734 All proposed actions on public lands will be analyzed for their potential to release hazardous materials into the environment. HAZARDOUS MATERIALS AND WASTES: "HZ04 – All proposed actions on public lands will be analyzed for their potential to release hazardous materials ...
1189 All roads must follow Gold Book standards "Soils and Water- Mitigation Measures: Various techniques will be employed to reduce soil erosion. ... Depending upon the site-specific situation, ...
3043 All water used for beneficial use will be under jurisdiction of the Wyoming State Engineer's Office A.12 Groundwater and Surface Water: "All water wells put to beneficial use, including produced water associated with this project, will be under the ...
3042 All water used myst be permitted by the Wyoming State Engineer's Office A.12 Groundwater and Surface Water: "All water used in association with this project will be permitted through the Wyoming State Engineer's Office."
2887 Allow department access to facilities and documents "Monitoring, Recording, and Reporting Requirements: Inspection and Entry: The permittee shall allow the head of the Department or the Regional ...
116 Allow new surface-disturbing activities on critical soils Soil and Water Resources: "SW01/PW30 – Allow new surface-disturbing activities on critical soils on about 75,000 acres within level 3 lands only if ...
3017 Allowances for temporary and minor disturbances A.6 Pipelines: "Temporary disturbances which do not require major excavation (e.g., small pipelines and communication lines) may be stripped of ...