| BMP ID: |
5765 |
| Title: |
Keep pressurized and install a static seal with these following instructions. |
| Text: |
Methane Recovery - Option 3: "Keep pressurized and install a static seal
â—† Automatic controller activates rod packing seal on shutdown and removes seal on startup
â—† Closed blowdown valve leaks
â—† Eliminates leaks from off-line compressor seals
â—† Reduces fugitive methane losses by 1.25 Mcf/hr (89%)" |
| Source Publication Name: |
Reducing Emissions When Taking Compressors Off-line: Lessons Learned from Natural Gas STAR |
| Citation Section: |
Methane Recovery |
| Citation Page: |
9 |
| Supplemental Documents: |
|
| Usage Type: |
Recommended |
| Timing: |
• Production / Operation / Maintenance
|
| Oil / Gas Field: |
|
| Surface Ownership: |
• Federal
• State
• Private
|
| Mineral Ownership: |
• Federal
• State
• Private
|
| Primary Contact: |
Environmental Protection Agency Ariel Rios Building, 1200 Pennsylvania Avenue, N.W. Washington, DC 20460 United States |
| Phone: | (202) 272-0167 |
|
Alt. Phone: | (202) 272-0165 |
| Fax: | |
|
E-mail: | |
|
| Alternate Contact: |
|
| |
| Categories: |
Air Quality and Emissions
|
| Location: |
General / Federal |
| Species: |
|
| Vegetation Types: |
|
| General Comments: |
|
| Cost-Benefit Analysis: |
|
| BMP Efficacy: |
|
| Date Entered: |
2009-06-22 13:34 UTC |
| Last Updated: |
2011-01-29 13:44 UTC |