| BMP ID: |
4538 |
| Title: |
Begin Directed Inspection and Maintenance (DI&M) at Remote Facilities. |
| Text: |
Table 1â€"Cost-Effective Options for Reducing Methane Emissions: "Begin Directed Inspection and Maintenance (DI&M) at Remote Facilities. Fluctuations in pressure, temperature, and mechanical stresses on pipeline components (such as valves and seals) eventually cause them to leak. A DI&M program concentrates on components such as valve packing, pneumatic controllers, open-ended lines, blowdown (sic) lines, pneumatic engine-starter motors, and pressure-relief valves, which are prone to large leaks that are cost-effective to find and fix. A survey is conducted in the first year of a DI&M program to identify leaking components. In subsequent years, inspection and repair efforts are focused on components that are the most likely to leak and most cost-effective to repair. Partner companies report that leak surveys cost U.S. $200 per station when multiple remote stations are surveyed at one time." [see Table 2 and 3 in the source document for costs, benefits and production characteristics] |
| Source Publication Name: |
Cost-effective methane emissions reductions for small and midsize natural gas producers |
| Citation Section: |
Table 1 |
| Citation Page: |
3 |
| Supplemental Documents: |
|
| Usage Type: |
Recommended |
| Timing: |
• Production / Operation / Maintenance
|
| Oil / Gas Field: |
|
| Surface Ownership: |
• Federal
• State
• Private
|
| Mineral Ownership: |
• Federal
• State
|
| Primary Contact: |
Environmental Protection Agency Ariel Rios Building, 1200 Pennsylvania Avenue, N.W. Washington, DC 20460 United States |
| Phone: | (202) 272-0167 |
|
Alt. Phone: | (202) 272-0165 |
| Fax: | |
|
E-mail: | |
|
| Alternate Contact: |
|
| |
| Categories: |
Air Quality and Emissions
|
| Location: |
General / Federal |
| Species: |
|
| Vegetation Types: |
|
| General Comments: |
|
| Cost-Benefit Analysis: |
Cost & Benefits:
Equipment Cost = N/A;
O&M Cost = $1 per component screened;
Saleable Gas Saving (Mcf/d) = 1.0;
Expected Payback = N/A;
Operating Requirement = Soap solution and/or Gas Detector;
Basis for cost saving = Screening 200 components, repair leaks
in one open-ended blowdown valve and one control valve
stem seal;
Other Benefits = N/A
|
| BMP Efficacy: |
|
| Date Entered: |
2009-04-15 09:04 UTC |
| Last Updated: |
2011-07-17 13:48 UTC |